1. Which of the following is the net requirement using an MRP program if the gross requirement is 10,000 and the inventory on hand is 4,000?
• 10,000
• 14,000
• 6,000
• 4,000
2. Which of the following is one of Dr. Eli Goldratt’s rules of production scheduling for optimized production technology?
• An hour saved at a bottleneck operation does not increase the process flow.
• If you lose an hour at a bottleneck it is better than making scrap.
• Do not allow bottlenecks to govern the flow of the line.
• Utilization and activation of a resource are not the same.
•
3. Which is the one correct value stream principle?
• Look for efficiencies in the factory, office, physical, procedural, and technical operations.
• Eliminate waste that stops, slows down, or diverts the value stream.
• Concentrate on speeding up value-adding operations rather than removing waste.
• Keep the value stream moving at minimum velocity.
4. Which production process term best describes the situation when activities in a stage of production must stop because there is no work?
• Blocking
• Starving
• Staging
• Buffering
5. Which of the following is an element that addresses elimination of waste under lean production?
• Kanban production control system
• Production ahead of demand
• Minimized run times
• Group plant loading technology
6. Which of the following is an analytical tool used in Six-Sigma quality improvement programs?
• Gantt charts
• Pareto charts
• Tree charts
• Pedigree charts
7. Which of the following is usually included as an inventory holding cost?
• Order placing
• Quantity discounts
• Breakage
• Typing up an order
8. Which of the following is a characteristic that can be used to guide the design of service systems?
• Services are all similar.
• Services businesses are inherently entrepreneurial.
• Quality work means quality service.
• Services cannot be inventoried.
9. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled?
• MRP (Material Requirements Plan)
• ERP (Enterprise Resource Planning)
• MPS (Master Production Schedule)
• WBS (Work Breakdown Structure)
10. There are many applications of poka-yokes in service organizations. Which of the following is one of the three-T’s used to classify poka-yokes?
• Trust
• Teamwork
• Task
• Time
11. The ability to rapidly and inexpensively switch production from one product to another enables which of the following:
• Economies of shape
• Economies of size
• Economies of scale
• Economies of scope
12. Which of the following is a cost impact and payoff analysis tool from the operations consulting tool kit?
• Statistical tools
• Decision trees
• Work sampling
• Gap analysis
13. Which of the following is a major factor that distinguishes service design and development from manufacturing design and development?
• The service package has the same legal protection available to manufactured goods.
• Manufacturing is far more capital intensive than services.
• The service process and service product can be developed independently.
• The service package is the major output of the development process.
14. In a Gantt chart the vertical axis represents which of the following?
• Time
• Revenue
• Tasks
• Cost
15. A project can be segmented into which of the following?
• Events
• Sub-jobs
• Work packages
• Success markers
16. Which of the following is considered a major process flow structure?
• Lead Time
• Fabrication
• Lean Manufacturing
17. ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm?
• Certification is sought by any firm assuming they pay annual dues.
• 2nd Party – where a customer audits its supplier
• 3rd Party – where a qualified national or international standards/certifying agency serves as an auditor
• 1st Party – where a firm audits itself against ISO standards
18. Which of the following is ISO 14000 primarily concerned with?
• Quality management
• Time management
• Continuous improvement management
• Environmental management
19. What is the starting point in developing a capacity plan for a health care operation?
• Determining the effective capacity over time
• Estimating design capacity
• Forecasting patient demand for a reasonable length of time
• Discovery of the bottleneck operation
20. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?
• Level elements
• Future elements
• Past elements
• Cyclical elements
21. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following:
• Reducing product quality during the assembly process
• Designing products so they can be manufactured by a virtual factory
• Reducing equipment in the production process
• Simplification of the product by reducing the number of separate parts
22. Which of the following is one of the principles of reengineering?
• Quality at the source
• Do not select suppliers on the basis of price alone.
• Have those who use the output of a process perform the process.
• Leverage high cost employees with lower cost employees.
23. Considering Hau Lee’s uncertainty framework for classifying supply chains, which of the following is given to a supply chain which has an evolving supply process based on functional products?
• Risk hedging
• Forward looking
• Efficient
• Agile
24. According to the theory of constraints, which of the following can be a capacity-constrained resource (CCR)?
• Product design
• Inoperable equipment
• An employee
• A customer
25. According to the theory of constraints, which of the following financial measurements can be used to measure the firm’s ability to make money?
• Operating expenses
• Dividends
• Sales
• Return on investment
26. Deming’s PDCA (plan, do, check, and act) cycle underlies what inherent Six Sigma principle?
• Continuous improvement
• Control charting
• Standard deviation
• Project management
27. The Shingo system states that the way to prevent defects from coming out at the end of a process is to do which of the following:
• Redesign the process in order to mitigate the bottlenecks.
• Utilize SQC (statistical quality control).
• Introduce controls within the process.
• Slow down production rates until the process is in control.
28. Which of the following terms describes the time a unit spends actually being worked on together with the time spent waiting in a queue?
• Flow time
• Build time
• Cycle time
• Run time
29. During the implementation of a project, which of the following should be the primary focus of a consulting firm?
• The correct project software
• Application of the learning curve theory
• Tools and materials availability
• People management skills
30. A project manager must consider several components when overseeing the planning process of aggregate operations; specifically, whether such components are factors that are internal or external to the organization. Which of the following factors would be classified as an internal component for an organization?
• Inventory levels and economic conditions
• Market demand and subcontractor capacity
• Current physical capacity and current workforce
• Competitor behavior and current workforce
OPS 571 Final Exam Solution
OPS/571 Final Exam Quiz
OPS571 Final Exam MCQ
Try it now!
How it works?
Follow these simple steps to get your paper done
Place your order
Fill in the order form and provide all details of your assignment.
Proceed with the payment
Choose the payment system that suits you most.
Receive the final file
Once your paper is ready, we will email it to you.
Our Services
Custom Writings Help is a Quality-Oriented Company in Online Writing as a result of hiring exceptional professionals to execute clients' tasks.
Essays
At Custom Writings Help,We understand the struggle of research paper writing, and that is why at Custom WritingS Help, we are all out to help you. We pride ourselves on having a team of clinical writers. The stringent and rigorous vetting process ensures that only the 'BEST' Writers are chosen for the job. We have highly qualified Ph.D. and MA writers working with us; we equally offer these experienced writers specific bonuses and incentives to make them deliver highly original, unique, and informative content at reasonably low prices.
Admissions
Thesis Writing Service
Worlwide, Many Masters Students are struggling with Thesis Completion. A thesis is likely to be the longest and most challenging piece of work a student has ever completed. However, unlike essays and other assignments, a student can pick a particular interest topic and work on their initiative. Fortunately, we are there for you. At Custom Writings Help, you are assured of an authentic, imaginative, informative, linguistically great, and advantageous thesis that adheres to all your needs. So, why continue considering different writers when you have discovered the best in the field?
Editing
Custom Papers
Not a single student can avoid writing custom papers. However, a total lack of experience, skills, and time makes it very hard to produce a superb writing piece. Therefore, if you are seeking professional help, turn to us. Our specialized and experienced writers compose a variety of model papers, including custom essays, college term papers, research papers, book reports, MBA essays, executive summaries, dissertations, Ph.D. theses, admission essays, and research proposals for college and university students at any level.
Coursework
Essay Writing
Most of the students disregard the critical principles of essay writing and compose papers below sensible guidelines. Therefore, with Custom Writings Help, one should not worry about his/her essay. Our Writers compose informative and engaging content on all complexities and topics. We write meaningful and smart essays while prioritizing all aspects that bring about a good grade, such as impeccable grammar, proper structure, zero-plagiarism, and conformance to guidelines.
Coursework
Coourse Work Writing
Don't let the seemingly never-ending onslaught of writing assignments get you down. If you are looking where to get course work assistance online, the writers at Custom Writings Help are here to assist you with all of your writing needs. We undertake to unique delivery of papers that meet the professor's requirements. The content is proofread, edited, and checked plagiarism before submission to customers. No matter how big or small your work is, we will deliver on time. Try US Now! !
Coursework
Dissertation Writing Service
High-Quality Dissertation Writing Services are rare. They require Ph.D. academicians – not easily found. However, are an exception. The years, time, and resources we have invested in the dissertation world has given us a competitive advantage over others. Choose to come to Custom Writings Help; You will find perfect Ph.D. consultants who have written hundreds of dissertations theses ready to help you. Let our dissertation-writing services help you craft your dissertation, for you are assured we will give you the results.