1. If the solution values of a linear program are rounded in order to obtain an integer solution, the solution is: (Points : 5)

always optimal and feasible.

sometimes optimal and feasible.

always feasible.

never optimal and feasible.

Question 2. 2. A PERT/CPM activity has an optimistic time estimate of 3 days, a most likely time estimate of 8 days, and a pessimistic time estimate of 10 days. The expected time (in days) of this activity is ____. (Points : 5)

7.0

7.5

8.0

8.5

Question 3. 3. The critical path is the ________ path through the network. (Points : 5)

longest

shortest

straightest

most expensive

Question 4. 4. For most graphs, the constraint equations which intersect to form a solution point must be solved simultaneously: (Points : 5)

because the solution coordinates from the graph cannot be visually read with high precision.

in order to confirm the mathematically determined coordinates.

in order to determine all of the optimal point solution.

because the slope b and the y-intercept a are not always integers.

Question 5. 5. Cully Turniture buys two products for resale: big shelves (B) and medium shelves (M). Each big shelf costs $500 and requires 100 cubic feet of storage space, and each medium shelf costs $300 and requires 90 cubic feet of storage space. The company has $75,000 to invest in shelves this week, and the warehouse has 18,000 cubic feet available for storage. Profit for each big shelf is $300 and for each medium shelf is $150. What is the storage space constraint? (Points : 5)

90 B + 100 M = 18000

90 B + 100 M = 18000

100 B + 90 M = 18000

500 B + 300 M = 18000

Question 6. 6. In a 0-1 integer programming model, if the constraint x1 – x2 = 0, it means when project 2 is selected, project 1 ________ be selected. (Points : 5)

must always

can sometimes

can never

is already

Question 7. 7. Which of the following is not an integer linear programming problem? (Points : 5)

Pure integer

Mixed integer

0-1 integer

Continuous

Question 8. 8. The $75 per credit hour course fee tacked on to all the MBA classes has generated a windfall of $56,250 in its first semester. “Now we just need to make sure we spend it all,” the Assistant Dean cackled. She charged the Graduate Curriculum Committee with generating a shopping list before their next meeting. Four months later, the chairman of the committee distributed the following. As the professor for the quantitative modeling course, he tended to think in terms of decision variables, so he added the left-most column for ease of use.

Decision

Variable Item Cost Note

A iPads for everybody $750/unit Must get a cover if these are purchased

B iPad covers with MBA logo $25/unit Not needed unless we buy iPads

C Speaker series $15,000 Can’t afford both this and the iPads

D Subscriptions to the Wall

Street Journal $10/unit Don’t need if we have the electronic version

E Subscriptions to the electronic

version of the Wall Street

Journal $5/unit Worthless without the iPads

Which constraint best describes the situation with decision variables A and B? (Points : 5)

B – A = 0

B + A = 0

B + A = 1

B – A = 1

Question 9. 9. Non-negativity constraints: (Points : 5)

require the use of greater-than-or-equal-to constraints.

restrict the decision variables to positive values.

restrict the decision variables to negative values.

do not restrict the sign of the decision variable.

Question 10. 10. Which of the following could be a linear programming objective function? (Points : 5)

Z = 1A + 2BC + 3D

Z = 1A + 2B + 3C + 4D

Z = 1A + 2B / C + 3D

Z = 1A + 2B2 + 3D

Question 11. 11. A graphical solution is limited to linear programming problems with: (Points : 5)

1 decision variable.

2 decision variables.

3 decision variables.

4 decision variables.

Question 12. 12. The term refers to testing how a problem solution reacts to changes in one or more of the model parameters. (Points : 5)

Priority recognition

Decision analysis

Analysis of variance

Sensitivity analysis

Question 13. 13. Which of the list of items below is not a component of a linear programming problem? (Points : 5)

Constraints

Objective function

Decision variables

Nonlinear residual

Question 14. 14. Types of integer programming models are ________. (Points : 5)

total

0-1

mixed

all of the above

Question 15. 15. If we are solving a 0-1 integer programming problem, the constraint x1 + x2 = 1 is a ________ constraint. (Points : 5)

multiple-choice

mutually exclusive

conditional

corequisite

Question 16. 16. The $75 per credit hour course fee tacked on to all the MBA classes has generated a windfall of $56,250 in its first semester.“Now we just need to make sure we spend it all,” the Assistant Dean cackled. She charged the Graduate Curriculum Committee with generating a shopping list before their next meeting. Four months later, the chairman of the committee distributed the following. As the professor for the quantitative modeling course, he tended to think in terms of decision variables, so he added the left-most column for ease of use.

Decision

Variable Item Cost Note

A iPads for everybody $750/unit Must get a cover if these are purchased

B iPad covers with MBA logo $25/unit Not needed unless we buy iPads

C Speaker series $15,000 Can’t afford both this and the iPads

D Subscriptions to the Wall

Street Journal $10/unit Don’t need if we have the electronic version

E Subscriptions to the electronic

version of the Wall Street

Journal $5/unit Worthless without the iPads

Which of the following constraints best describes the relationship between the electronic Wall Street Journal subscription and the iPads? (Points : 5)

E + A = 0

E + A = 1

E – A ≤ 0

E – A ≤ 1

Question 17. 17. A work breakdown structure breaks down a project into: (Points : 5)

weeks.

areas.

arcs.

modules.

Question 18. 18. Cully Furniture buys two products for resale: big shelves (B) and medium shelves (M). Each big shelf costs $500 and requires 100 cubic feet of storage space, and each medium shelf costs $300 and requires 90 cubic feet of storage space. The company has $75,000 to invest in shelves this week, and the warehouse has 18,000 cubic feet available for storage. Profit for each big shelf is $300 and for each medium shelf is $150. If the furniture company purchases no big shelves and 200 medium shelves, which of the two resources will be completely used (at capacity)? (Points : 5)

Investment money only

Storage space only

Investment money and storage space

Neither investment money nor storage space

Question 19. 19. A linear programming model consists of: (Points : 5)

decision variables.

an objective function.

constraints.

all of the above

Question 20. 20. If a maximization linear programming problem consists of all less-than-or-equal-to constraints with all positive coefficients and the objective function consists of all positive objective function coefficients, then rounding down the linear programming optimal solution values of the decision variables will ________ result in a(n) ________ solution to the integer linear programming problem. (Points : 5)

always; optimal

always; non-optimal

never; non-optimal

sometimes; optimal

Get 20% Discount on This Paper
Pages (550 words)
Approximate price: -

Try it now!

Get 20% Discount on This Paper

We'll send you the first draft for approval by at
Total price:
$0.00

How it works?

Follow these simple steps to get your paper done

Place your order

Fill in the order form and provide all details of your assignment.

Proceed with the payment

Choose the payment system that suits you most.

Receive the final file

Once your paper is ready, we will email it to you.

Our Services

Custom Writings Help is a Quality-Oriented Company in Online Writing as a result of hiring exceptional professionals to execute clients' tasks.

Essays

Research Papers

At Custom Writings Help,We understand the struggle of research paper writing, and that is why at Custom WritingS Help, we are all out to help you. We pride ourselves on having a team of clinical writers. The stringent and rigorous vetting process ensures that only the 'BEST' Writers are chosen for the job. We have highly qualified Ph.D. and MA writers working with us; we equally offer these experienced writers specific bonuses and incentives to make them deliver highly original, unique, and informative content at reasonably low prices.

Admissions

Thesis Writing Service

Worlwide, Many Masters Students are struggling with Thesis Completion. A thesis is likely to be the longest and most challenging piece of work a student has ever completed. However, unlike essays and other assignments, a student can pick a particular interest topic and work on their initiative. Fortunately, we are there for you. At Custom Writings Help, you are assured of an authentic, imaginative, informative, linguistically great, and advantageous thesis that adheres to all your needs. So, why continue considering different writers when you have discovered the best in the field?

Editing

Custom Papers

Not a single student can avoid writing custom papers. However, a total lack of experience, skills, and time makes it very hard to produce a superb writing piece. Therefore, if you are seeking professional help, turn to us. Our specialized and experienced writers compose a variety of model papers, including custom essays, college term papers, research papers, book reports, MBA essays, executive summaries, dissertations, Ph.D. theses, admission essays, and research proposals for college and university students at any level.

Coursework

Essay Writing

Most of the students disregard the critical principles of essay writing and compose papers below sensible guidelines. Therefore, with Custom Writings Help, one should not worry about his/her essay. Our Writers compose informative and engaging content on all complexities and topics. We write meaningful and smart essays while prioritizing all aspects that bring about a good grade, such as impeccable grammar, proper structure, zero-plagiarism, and conformance to guidelines.

Coursework

Coourse Work Writing

Don't let the seemingly never-ending onslaught of writing assignments get you down. If you are looking where to get course work assistance online, the writers at Custom Writings Help are here to assist you with all of your writing needs. We undertake to unique delivery of papers that meet the professor's requirements. The content is proofread, edited, and checked plagiarism before submission to customers. No matter how big or small your work is, we will deliver on time. Try US Now! !

Coursework

Dissertation Writing Service

High-Quality Dissertation Writing Services are rare. They require Ph.D. academicians – not easily found. However, are an exception. The years, time, and resources we have invested in the dissertation world has given us a competitive advantage over others. Choose to come to Custom Writings Help; You will find perfect Ph.D. consultants who have written hundreds of dissertations theses ready to help you. Let our dissertation-writing services help you craft your dissertation, for you are assured we will give you the results.