Project Tendering in Building / report

This a report on the factors that influence on the accuracy of early-stage construction cost estimate based on a designed real-life construction project scenario.

Scenario: Assume you are employed by a property development company (client) as a construction cost consultant for their development projects. The company delivered 20 number (in total) residential, commercial, and land development (including infrastructure) projects, during 2017 and 2018. However, out of those 20 projects, the three projects described in Table 1 were completed with significant cost variations from the early-stage construction cost estimates, which were prepared by you in 2015. Company’s investors are concerned about the situation as their decision on investment for each project was mainly based on this early-stage construction cost estimate prepared by the cost consultant.

Choose 1 of the 3 in the below table in the next page

  1. 14 storey apartment
  2. 6 storey office
  3. 20 hectar
  • Introduction and brief project scenario (suggested around 500 words) You may develop the scenario further from the project details given in Column 2 in Table 1.

Please discuss which project was chosen on the left side of the column

  • Preliminary estimating method adopted in preparing the early stage construction cost estimate (suggested around 500 words) You are required to assume a suitable preliminary estimating technique for the chosen project scenario with justifications for your choice and describe how you used this method to prepare the early-stage construction cost estimate, with special emphasis on information availability and assumptions made at the time of preparing the estimate.

Discuss which estimating method was chosen and justify why this was chosen, also describe how this method was used in the early-stage construction cost estimate with emphasis on the availability and assumptions made at the time of preparing the estimate.

Estimating techniques: Function unit, superficial floor area, functional floor area : Below examples however please look into this

  • Detailed analysis of the chosen factors that influenced on the accuracy of early stage construction cost estimate and caused the final construction cost of the project to vary significantly from it. (suggested around 1000 words including a brief conclusion)

Please discuss the influencing factors on the right side of the table which caused the discrepancy

 

Please ensure this goes to someone specialises in architecture, otherwise this will not be done correctly.

2000 Words, 5-10 references Havard style: All australian references

Order a unique copy of this paper
(550 words)

Approximate price: $22

Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

We value our customers and so we ensure that what we do is 100% original..
At Custom Writing, we believe in exemplary services that are fully geared toward customer satisfaction. That is why we don’t shy away from giving you the following guarantees;

Money-back guarantee

Trusting us with your work is the best decision you have made, our pleasure lies in seeing you satisfied at 100%. If in the rear chance it happens that you are not satisfied, then know that we will equally not be satisfied. But worry not, our 30 days- Money back guarantee is all you need and that is what we promise you..

Read more

Zero-plagiarism guarantee

We utilize profoundly equipped and gifted writers who produce unique papers liberated from any form of plagiarism. To guarantee this, we run all papers finished by our scholars through a Plagiarism checker to ensure uniqueness and originality. In any case, on the off chance that you have vulnerabilities about the originality or falsification of any paper we have finished and conveyed to you, please get in touch with us straight away. We will quickly investigate, and if the paper is seen as counterfeited, we will take suitable actions including but not limited to, revising the paper for free and in extreme cases we will activate the money back guarantee.

Read more

Free-revision policy

We have an obligation deliver great and specially composed assignments. Our revision strategy endeavors to ensure total client satisfaction, comfort, and a genuine feelings of serenity. We make minor updates and corrections to the underlying request as part of our continuous assistance. However, revisions should just incorporate changes and alterations that were not effectively met, in the underlying request and that are inside the rules as per the current request structure..

Read more

Privacy policy

Our client's Data is an Integral part of our business but clearly, we are not in the business of offering our clients' very own data to others. We realize that you care how your online data is utilized and shared, we equally value your trust that we will do so cautiously and sensibly. We Promise to ensure the security of your own data during transmission by utilizing encryption conventions and programming. Likewise assist us with securing your information by not sharing your passwords and usernames.

Read more

Fair-cooperation guarantee

In submitting a request with us, you consent to the services we give. We will strive to take the necessary steps to convey a far reaching paper according to your prerequisites. Equally we depend on your cooperation to guarantee that we convey on this order.

Read more

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency